PLACE HOLDER WE NEED IMAGES
Demo Phase
Building was stripped down to the bare bone structure
50%+ structural flooring replaced
Complete demo of all roofing and windows throughout the building
All plumbing, electrical, and sewer removed
New Building Systems
Electrical:
- 459 Apartments: 200 AMP
- 459 Retail: 400 AMP
- 461 Apartments: 200 AMP
- 461 Retail: 800 AMP
Water Line:
- 459: Existing 1”
- 461: New 3”
Sewer Line:
- Each: 6″ new sewer line
PLACE HOLDER WE NEED IMAGES
Structural Enhancements and Exterior Work
Over 50% of floor joists replaced
Exterior walls reinforced
New rooftop dunnage installed for HVAC support
Brand-new roofing and drainage system
Energy-efficient windows throughout the building
Basement
Fully upgraded with new utility rooms
Smooth, leveled concrete flooring
Finished walls and ceilings
Recessed lighting in place
Ideal for support operations or storage use
Retail
Leveled floors ready for floor coverings
Combination of exposed brick and drywall walls, ready for paint
Finished ceilings throughout
All essential services in place: electrical, water, gas, and sewer
Ready for immediate tenant buildout
Apartments
Complete rebuild with all-new interiors
New windows, doors, HVAC, electrical, and plumbing
Modern kitchens and designer bathrooms
Sound-insulated layouts for comfort
Private balconies or terraces
Premium flooring and high-quality finishes